Joint-Stock Company “Production Association
"Ural Optical and Mechanical Plant named after Mr. E.S. Yalamov"
Рус | Eng

Рус  |Eng
  • About Company
    • History
    • For Shareholders
      • Interfax
      • Annual report
      • Quarterly reports
      • Financial statements
      • Documents
      • Provision of copies of documents
      • Disclosures
      • List of affiliates
      • Documents of subsidiaries of JSC PA UOMP
    • For Counteragents
    • Lean production
    • Procurement
      • Procurement from SME
    • Research and Development
    • Enterprises
      • Shvabe Opto-Electronics (Meizhou) Co., LTD
        • About Company
        • Company History
        • Company Management
      • Shvabe - Food Production Facility
    • Production
    • Quality Management System
    • Social Sphere
    • Labour conditions
    • Services
  • Products
    • Medicine
      • Anesthetic and respiratory
        • MAIA-01
        • SLE 1000
        • SLE 2000
        • SLE 5000
        • SLE 5000 w/o HFO
        • APDN-01
        • TEVLAR
      • Intensive cure unit
        • AED-А15
        • DFR-02
        • ECO
      • Neonatal
        • IDN-03
        • IDN-02
        • ITN-01
        • SNO
        • Radiant heat - Bono
        • OFN-02
        • OFN-03
        • ODN-01
        • BiliFlex
        • FC-1400
    • Geodesy
      • Theodolites
        • 2T5EN1
        • 3T2KA
        • 3T2KP
        • 3T5KP
        • 4T15P
        • 4T30P
      • Tacheometers
        • 6Ta2
        • 6Та3
      • Leveling units
        • 3N-5L
        • 4N-2KL
        • 4N-3KL
      • Satellite equipment
        • MR-8
        • MR-10
        • MT-5
        • RS-2
        • SMR-9
    • Lighting technology
      • LED Lighting Fixtures
        • DPO2, DPO3
        • DPO 4
        • DVB 32
        • DPB 42
        • DPB 65
        • DSP3
        • DKU 1, DKU 2
        • DKU 98-120
        • DKU 3000
        • DTU 1
        • DKU 1 – SMART
      • Gas discharge lighting devices
        • ZhKU51-150, ZhKU51-250
        • ZhKU 52-400
        • ZhKU53-70, ZhKU53-100, ZhKU53-150
      • Road traffic lights
        • DS5-30
        • DS6-25
        • DS7
        • DS7-25
        • DS7-30
        • DS7-33
        • DS7-P1
        • DS 7-40
        • DS7-06
        • DS7-13
        • DS7-07
        • DS8
        • DS8-25
        • DS8-30
        • DS8-P1
        • DS8-07
        • DS8-13
        • DS8-70
        • IVS 3
        • IVS 6
        • IVS 7
        • IVS 200
      • Modules for railway traffic lights
        • SZhDM1, SZhDM 1P, ZhSM1
        • SZhDM 2P, ZhSM 2
        • SZhDM 3P
      • LED Road Signs
        • ZNDS-900 Crosswalk
        • ZNDS-13 Wrong Way
        • ZNDS-13 Major Road
        • ZNDS-14 Bus Stop
        • ZNDS-16 Maximum Vehicle Speed Limit
        • ZNDS-16 Wrong Way
        • ZNDS-17 Coverage
        • ZNDS-4 Stop at intersection
      • Light Indicators
        • SVU1, SVU2, SVU3, SVU4
    • Microscopy
      • MIM-340
    • Optical surveillance systems
      • SON-530
      • SON-730
      • SMS-832
  • Opportunities Platform
    • Finishing Works
      • Services and Costs
      • Work examples
      • Our advantages
      • Working Hours
      • Contacts
    • Foundry Production
      • Services and Costs
      • Work examples
      • Our advantages
      • Working Hours
      • Contacts
    • Industrial Design
      • Our Team
      • How do we work?
      • Projects
        • Integro
        • DFR-03
        • MIM-340
        • Bono
        • Ultra
        • Inspirex
        • Ledos
        • Dozor
        • Emton
        • MT-1
        • Synergy
        • Inspiro
      • Mock-up Laboratory
      • Engineering
      • Packing Solutions
      • Working Hours
      • Contacts
    • Optical production
      • Services and Costs
      • Our Advantages
      • Working Hours
      • Contacts
    • Automated electronic production
      • Services and Costs
        • Automated surface mounting
        • Automated soldering of output components and mechanized manual assembly
        • Mounting, disassembly and restoration of microcircuits BGA leads
        • Production of patterns from stainless steel for soldering paste coating
        • Electronic units X-ray control
      • Our advantages
      • Working hours
      • Contacts
    • Machining
      • Services and Costs
      • Working Hours
      • Contacts
    • Manufacturing of non-standard equipment, tools and attachments
      • Working Hours
      • Contacts
    • Quality Control
      • Services and Costs
      • Our opportunities
        • The rain testing chamber
        • Mobile climate test chamber
        • Thermal moisture low pressure chamber 2080
        • Thermal moisture low pressure chamber 16000
        • Thermal Moisture Chamber 1500
        • Thermal Moisture Chamber 3400
        • Vibration Table 100
        • Vibration Table 1000
        • Vibration Table 2000
        • Electordynamic test bed
        • Fixed cold chamber unit
        • Fixed heating chamber unit
        • Dynamic and static dust chamber
        • Unique impact stand
      • Working Hours
      • Contacts
    • Medical services
      • Main medical directions
      • Paid services
      • Work in the CHI system
      • Documents
      • Working hours
      • Contacts
  • Careers
    • Education and work with young people
      • For School Children
      • For Students
      • For High School Graduates
      • For Employees
      • Конкурс сила света
    • Vacancies
  • INdigit 2.0
    • Integro
      • Contents and Functional Units
      • Materials
      • Advantages
      • Chromotherapy
    • InCity
      • Basic elements
      • System advantages
      • Functional and services
      • Development of identical feature and branding of carriers
  • References
    • About the products
    • About cooperation
  • Contacts

| Products | Geodesy | Leveling units

3N-5L
4N-2KL
4N-3KL

Leveling units

3N-5L

Measurement of excesses during construction works. Research in construction works.

3N-5L
4N-2KL

It is widely used in practice in construction, geodetic surveying, mining, irrigation and land improvement.

4N-2KL
4N-3KL

The automatic leveling unit is used for excavation, elevation marking, vertical planning, surveying for various engineering utilities.

4N-3KL


Send an application

+7 (343) 229-80-75 Call centre

+7 (343) 229-82-41 Manager

kancelyariya@uomz.com


JSC "PA "UOMP"
in the composition of "Shvabe" Holding
of "Rostec" State Corporation


Russia, 620100, Ekaterinburg,
33b Vostochnaya Str.
+7(343)229-80-75
kancelyariya@uomz.com
JSC "PA "UOMP" security hotline
About Company
Enterprises
Opportunities Platform
Careers
Contacts
For Shareholders